Donald removes the old, rotten floor; and then we replace and brace the joists with pressure treated lumber:

Then remove the flooring for the kitchen and remove the 20 nails per board.

Cut the board and refloor the livingroom:

Do the special bracing and re(sub)floor the kitchen with heavy duty ply.
No comments:
Post a Comment