5 Tons of stone outside (needs to be on the level inside).
Tada! Then 6mil vapor barrier and 1/2 inch insulation:
Wire Re-Mesh and ReBar and then Pex tubing for Radiant heat.
That's right: Radiant Heat in the Slab, in the bathroom, under the tub.
Subscribe to:
Post Comments (Atom)
1 comment:
great job on the radiant. your feet will be thanking you this winter.
Post a Comment