Watch your step.
Donald removes the old, rotten floor; and then we replace and brace the joists with pressure treated lumber:
Then remove the flooring for the kitchen and remove the 20 nails per board.
Cut the board and refloor the livingroom:
Do the special bracing and re(sub)floor the kitchen with heavy duty ply.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment