Extra specail bracing and OSB topping following a thin blue line.
Few from the front door and veiw from the front room.
Saturday, June 24, 2006
Thursday, June 15, 2006
Floor to Floor Flooring
Watch your step.
Donald removes the old, rotten floor; and then we replace and brace the joists with pressure treated lumber:
Then remove the flooring for the kitchen and remove the 20 nails per board.
Cut the board and refloor the livingroom:
Do the special bracing and re(sub)floor the kitchen with heavy duty ply.
Donald removes the old, rotten floor; and then we replace and brace the joists with pressure treated lumber:
Then remove the flooring for the kitchen and remove the 20 nails per board.
Cut the board and refloor the livingroom:
Do the special bracing and re(sub)floor the kitchen with heavy duty ply.