Mike and Mark begin by removing old, poorly-routed, second floor drains; while Ray dug a ditch for the new below ground sewage drain (yes, the old sewage went above ground, and had a hole in the pipe).
Mike and Mark put in drains for Washer, toilet, shower, sink and second floor; while Ray continued to dig a ditch.
Mark and Mike plumbed the half bath and the kitchen, including a rather long, inventive and up-to-code, air vent for the half bath. This all needed to go out a new hole to the ditch Ray was still digging.
Wow, what a ditch. Who dug that ditch?
The old, above ground drain is bypassed and the sewage pipe is dipped down to a new below grade exit.
Then, front of the house meets back in a 4 inch double wye; and Ray began to cover the drains with stone -- oh, and fill in a ditch.